Exhaust Manifold - Right Side
WARNING: This page is about a different variant/trim than selected.
NOTE:
The bolts used to secure the exhaust manifold are stainless steel at locations 7 and 9. All bolts removed must be installed in the same location were they were removed from.
- Prior to installation, make sure all gasket mating surfaces are clean and free of any debris.NOTE:
Install the right exhaust manifold and gasket from below the engine and through the rear of the engine compartment. Make sure the gasket is properly seated before installing the manifold bolts/studs.
- Position the exhaust manifold and gasket and install the bolts/studs hand tight.
- Using the sequence shown in the illustration, tighten the exhaust manifold bolts/studs to 25 N.m (18 ft. lbs.).
- Position the exhaust manifold heat shield, install the rear heat shield retaining nuts and tighten to 8 N.m (71 in. lbs.).
- Install the right exhaust pipe/catalytic converter. Refer to CONVERTER, CATALYTIC, INSTALLATION
.
- If equipped, position the skid plate (1), install the skid plate four retaining bolts (2) and tighten to 28 N.m (21 ft. lbs.).
- Lower the vehicle.
- Install the exhaust manifold heat shield front retaining nuts and tighten to 8 N.m (71 in. lbs.).
- Connect the right upstream 02 sensor electrical connector (1).
- Connect the negative battery cable (2).
- Install the engine cover (2).
- Install the oil fill cap (1).
- Start the engine and check for leaks.