LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2018 >> Grand Cherokee Laredo, RWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 21 (Mp3023 Transfer Case (Service Information)) >> Fluid >> Standard Procedure >> Standard Procedure - Fluid Drain/Refill

Standard Procedure - Fluid Drain/Refill

WARNING: This page is about a different variant/trim than selected.

The fill and drain plugs are both in the rear case.

GC0146279Courtesy of CHRYSLER GROUP, LLC
  1. Raise vehicle. Ensure that the vehicle is level on the hoist.
    NOTE:

    The air suspension system will auto-disable when lifted on a frame hoist, or when jacking one corner of the vehicle. The air suspension may attempt to change height slightly prior to switching to auto-disable. A manual disable is also available by pressing the "Up" and "Down" switches of the terrain select switch simultaneously for more that 5 seconds. The air suspension system will return to normal operation when the vehicle speed reaches 25 KPH (15 MPH).

  2. Position drain pan under transfer case.
  3. Remove fill plug (1) and drain plug (2) and drain lubricant completely.
  4. Install drain plug (2) and tighten plug to the proper specification. Refer to TORQUE SPECIFICATIONS  .
  5. Fill transfer case to bottom edge of fill plug opening with MOPAR® ATF+4
  6. Install and tighten fill plug (1) and tighten plug to the proper specification. Refer to TORQUE SPECIFICATIONS  .
  7. Lower vehicle.