LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2018 >> Grand Cherokee Laredo, RWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 13 (3.0L Turbo Diesel (Service Information)) >> Lubrication >> Pan, Oil >> Installation >> Upper Oil Pan

Upper Oil Pan

WARNING: This page is about a different variant/trim than selected.
GC0146709Courtesy of CHRYSLER GROUP, LLC
  1. Clean and gasket sealing surfaces. Refer to ENGINE GASKET SURFACE PREPARATION .
    NOTE:

    Clean the oil pan sealing surfaces with isopropyl alcohol in preparation for sealant application.

  2. Apply a 3 mm wide bead of Mopar® Threebond Engine RTV Sealant to the timing cover to engine block T-joints (1).
    GC0146707Courtesy of CHRYSLER GROUP, LLC
  3. Install a NEW  oil pan gasket (3).
    Fig 1: Upper Oil Pan Tightening Sequence
    GC0146708Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    Stud bolts in the following positions (4, 14, 17, 19, 21, and 23).

  4. Install the upper oil pan and tighten the bolts finger tight:
    • Using the tightening sequence shown in the illustration, tighten the bolts to 15 N.m (11 ft. lbs.).
    • Loosen each bolt one at a time 90 degrees, then using the tightening sequence shown in the illustration tighten bolts to 15 N.m (11 ft. lbs.).
    GC0146707Courtesy of CHRYSLER GROUP, LLC
  5. Install the upper oil pump pick-up tube bolt (2) and tighten to 11 N.m (8 ft. lbs.).
    GC0146606Courtesy of CHRYSLER GROUP, LLC
  6. Install the bolts (1) attaching the Crankshaft Position Sensor (CKP) harness connector bracket (2) to oil pan and tighten to 8 N.m (71 in. lbs.).
    GC0146607Courtesy of CHRYSLER GROUP, LLC
  7. Connect the CKP wire harness connector (1).
  8. Attach the starter wire harness to upper oil pan.
  9. Position the EHPS pump, install the bolts and tighten to 23 N.m (17 ft. lbs.).
  10. Install the bolts securing the transmission cooler liner to oil pan and securely tighten bolts.
  11. Install the four transmission-to-oil pan bolts and tighten to 55 N.m (41 ft. lbs.).
    GC0146172Courtesy of CHRYSLER GROUP, LLC
  12. Install the steering gear (1). Refer to GEAR, INSTALLATION .
    GC0145633Courtesy of CHRYSLER GROUP, LLC
  13. If equipped with AWD, install the front axle (1). Refer to INSTALLATION .
  14. Install the lower oil pan. Refer to PAN, OIL, INSTALLATION .
    GC0146793Courtesy of CHRYSLER GROUP, LLC
  15. Install the upper oil dip stick tube bolt and tighten to 11 N.m (8 ft. lbs.).
  16. Position the A/C compressor to the A/C compressor bracket (7) and install the stud (3). Tighten the stud (3) to 10 N.m (89 in. lbs.).
  17. Install and hand tighten the nut (4) that secures the A/C compressor to the bracket.
  18. Tighten the two bolts to 28 N.m (21 ft. lbs.) using the following sequence:
    • Bolt (2) at rear of compressor.
    • Bolt (5) at front of compressor.
  19. Tighten the nut (4) at the front of the A/C compressor to 28 N.m (21 ft. lbs.).
  20. Connect the A/C clutch wire harness connector (1).
    GC0146633Courtesy of CHRYSLER GROUP, LLC
  21. Install the serpentine belt (2). Refer to BELT, SERPENTINE, INSTALLATION .
  22. Install the air cleaner body. Refer to BODY, AIR CLEANER, INSTALLATION .
    GC0146436Courtesy of CHRYSLER GROUP, LLC
  23. Remove the engine cover (1).
  24. Install the front suspension skid plate. Refer to PLATE, SKID, TRANSFER CASE, INSTALLATION .
  25. Install the front skid plate. Refer to PLATE, SKID, TRANSFER CASE, INSTALLATION .
  26. Install the oil level indicator tube. Tighten bolt to 11 N.m (8 ft. lbs.).
  27. Replace the oil filter and fill the engine with recommended engine oil. Refer to CAPACITIES AND RECOMMENDED FLUIDS, SPECIFICATIONS .
  28. Connect the negative battery cable.