Diagnostic Test
WARNING: This page is about a different car, the 2017 Jeep Cherokee. However, it is still accessible from the selected car via links, so may be relevant.
- CHECK FOR ACTIVE DTCS
- With the scan tool, record and erase the DTCs.
- Cycle the ignition off, wait 10 seconds, then cycle the ignition on.
- If possible, operate the liftgate several times.
- With the scan tool, read the Active DTCs.
Does the scan tool display; B1949-2A-POWER LIFTGATE REAR ZONE SWITCH - STUCK?
Yes
- Go To 2
No
- Test complete, the condition or conditions that originally set this DTC are not present at this time. Using the wiring diagrams as a guide, check all related splices and connectors for signs of water intrusion, corrosion, pushed out or bent terminals and poor pin fit.
- Perform the BODY VERIFICATION TEST. Refer to BODY VERIFICATION TEST .
- INSPECT THE POWER LIFTGATE REAR ZONE SWITCH STICKING OR BINDING
- Turn the ignition off.
- Inspect the Power Liftgate Rear Zone Switch sticking or binding.
Is the switch assembly damaged or sticking?
Yes
- Go To 3
No
- Replace the Power Liftgate Rear Switch in accordance with the Service Information. Refer to SWITCH, EXTERIOR HANDLE, REMOVAL .
- Perform the BODY VERIFICATION TEST. Refer to BODY VERIFICATION TEST .
- CHECK THE LIFTGATE REAR SWITCH FOR A SHORT
- Disconnect the Power Liftgate Rear Switch connector.
- Erase the DTCs.
- Cycle the ignition off, wait 15 seconds, then cycle the ignition on.
- With the scan tool, read the Active DTCs.
Does the scan tool display; B1949-2A-POWER LIFTGATE REAR ZONE SWITCH - STUCK?
Yes
- Go To 4
No
- Replace the Power Liftgate Rear Switch in accordance with the Service Information. Refer to SWITCH, EXTERIOR HANDLE, REMOVAL .
- Perform the BODY VERIFICATION TEST. Refer to BODY VERIFICATION TEST .
- ISOLATE AND CHECK THE (G29) LIFTGATE SWITCH SIGNAL CIRCUIT FOR A SHORT TO GROUND
- The ignition must be off when checking a circuit for continuity to ground.
- Isolate the circuit by disconnecting the Power Liftgate Module C2 harness connector containing the circuit being tested. Note: Use the wiring diagram as a guide to follow the path of the circuit.
- Connect the negative lead of the DVOM to a known good ground.
- With the positive lead of the DVOM, probe the circuit being tested at the component harness connector and check for continuity between the circuit and ground.NOTE:
There should be no continuity between ground and the circuit being tested.
Is there continuity between ground and the circuit being tested?
Yes
- Repair the (G29) Liftgate Switch Signal circuit for a short to ground.
- Perform the BODY VERIFICATION TEST. Refer to BODY VERIFICATION TEST .
No
- Replace the Power Liftgate Module in accordance with the Service Information. Refer to MODULE, POWER LIFTGATE CONTROL (PLGM), REMOVAL .
- Test complete. Perform the BODY VERIFICATION TEST. Refer to BODY VERIFICATION TEST .