LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2017 >> Wrangler Rubicon, Automatic Trans >> Repair and Diagnosis >> Electrical >> Gauges >> Body - Interior & Exterior >> Instrument Panel >> Bezel, Instrument Cluster >> Installation

Bezel, Instrument Cluster: Installation

GC0148249Courtesy of CHRYSLER GROUP, LLC
  1. Position the bezel (2) into place and seat the 19 clips (1) fully.
    GC0148273Courtesy of CHRYSLER GROUP, LLC
  2. Install the screws (3).
  3. Install the screw (2) in the switch/bin opening.
  4. Install the storage bin screw (1) and position the bin mat back into place.
    GC0148197Courtesy of CHRYSLER GROUP, LLC
  5. Position the window switch assembly (2) and connect electrical harness connectors.
  6. Position the switch and press into place, engaging the integrated latches.
  7. Position the storage bin, if equipped, back and seat fully.
    GC0148275Courtesy of CHRYSLER GROUP, LLC
  8. Install the HVAC outlets (1). Refer to OUTLET, AIR, INSTALLATION .
    GC0148248Courtesy of CHRYSLER GROUP, LLC
  9. Install the HVAC outlets (1). Refer to OUTLET, AIR, INSTALLATION .
  10. Install the steering column opening cover (3). Refer to COVER, STEERING COLUMN OPENING, INSTALLATION .