Diagnostic Test
WARNING: This page is about a different car, the 2016 Dodge Journey and 2015 Dodge Journey. However, it is still accessible from the selected car via links, so may be relevant.
- DTC IS ACTIVE NOTE:
If there are any ASD/Main Relay or system voltage DTCs present, diagnose those DTCs before proceeding with this test procedure.
- Ignition on, engine not running.
- With the scan tool, select View DTCs. Copy DTC and Freeze Frame information and clear DTCs.NOTE:
Active or pending DTCs may not allow A/C clutch actuation, make sure all DTCs are cleared before proceeding with this test procedure.
- With the scan tool, actuate the A/C Compressor.
- Monitor the scan tool for at least two minutes.
- With the scan tool, select View DTCs.
Is the status Active for this DTC?
Yes
- Go To 2
No
- Perform the INTERMITTENT CONDITION diagnostic procedure. Refer to INTERMITTENT CONDITION . .
- A/C CLUTCH RELAY
- Turn the ignition off.
- Disconnect the PDC C3 harness connector.
- Install a know good relay in place of the existing A/C Clutch Relay.
- Using a scan tool, erase the DTC.
- Start the engine and and turn the A/C on.
Does the DTC return?
Yes
- Go To 3
No
- Replace the A/C Clutch Relay.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST . .
- (C13) A/C CLUTCH RELAY CONTROL CIRCUIT SHORTED TO GROUND
- Turn the ignition off.
- Disconnect the PDC C3 harness connector.
- Disconnect the PCM C1 harness connector.
- Measure the resistance between ground and the (C13) A/C Clutch Relay Control circuit in the PCM C1 harness connector.
Is the resistance below 100 Ohms?
Yes
- Repair the short to ground in the (C13) A/C Clutch Relay Control circuit.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST . .
No
- Go To 5
- (C13) A/C CLUTCH CONTROL CIRCUIT OPEN OR HIGH RESISTANCE IN THE PDC
- Measure the resistance of the (C13) A/C Clutch Control circuit between the Relay terminal and the PDC C3 harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Go To 5
No
- Replace the PDC for an open in accordance with the service information.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST . .
- Measure the resistance of the (C13) A/C Clutch Control circuit between the Relay terminal and the PDC C3 harness connector.
- (C13) A/C CLUTCH CONTROL CIRCUIT OPEN OR HIGH RESISTANCE BETWEEN THE PCM AND PDC
- Measure the resistance of the (C13) A/C Clutch Control circuit between PCM C1 harness connector and the PDC C3 harness connector.
Is the resistance below 5.0 Ohms?
Yes
- Go To 6
No
- Replace the PDC for an open in accordance with the service information.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST . .
- Measure the resistance of the (C13) A/C Clutch Control circuit between PCM C1 harness connector and the PDC C3 harness connector.
- (C13) A/C CLUTCH CONTROL CIRCUIT SHORTED TO GROUND IN THE PDC
- Measure the resistance between ground and the (C13) A/C Clutch Control circuit at the Relay terminal.
Is the resistance below 100 Ohms?
Yes
- Replace the PDC for an internal short to ground in accordance with the service information.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST . .
No
- Go To 7
- Measure the resistance between ground and the (C13) A/C Clutch Control circuit at the Relay terminal.
- POWERTRAIN CONTROL MODULE (PCM)
- Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the Totally Integrated Power Module (TIPM) and the Powertrain Control Module (PCM).
- Look for any chafed, pierced, pinched or partially broken wires.
- Look for broken, bent, pushed out or corroded terminals. Verify that there is good pin to terminal contact in the related connectors.
- Perform any Technical Service Bulletins that may apply.
Were any problems found?
Yes
- Repair as necessary.
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST . .
No
- Replace and program the Powertrain Control Module (PCM) in accordance with the Service Information. Refer to MODULE, POWERTRAIN CONTROL, REMOVAL .
- Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST . .