  1. ACTIVE DTC 
    NOTE:

    If any of the following component DTCs have set along with P0688, diagnose them first before continuing: Ignition Coil(s), Fuel Injector(s), ASD Control.

    1. Ignition on, engine not running.
    2. With the scan tool, select View DTCs.

      Is the DTC Active at this time?

      Yes 

      • Go To  2

      No 

  2. (K51) ASD CONTROL CIRCUIT OPEN 
    1. Turn the ignition off.
    2. Measure the resistance of the (K51) ASD Control circuit from the C3 PDC harness connector to the appropriate terminal of PCM harness connector.

      Is the resistance below 5.0 Ohms?

      Yes 

      • Go To  4

      No 

  3. (F342) ASD CONTROL OUTPUT CIRCUIT(S) SHORTED TO GROUND 
    1. Measure the resistance between ground and each of the (F342) ASD Control Output circuits in the C3 PDC harness connector.

      Is the resistance below 100 Ohms?

      Yes 

      • Repair the short to ground in the (F342) ASD Control Output circuit(s).
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .

      No 

      • Go To  5
  4. (F342) ASD CONTROL OUTPUT CIRCUIT(S) OPEN 
    1. Turn the ignition off.
    2. Disconnect the C3 PDC harness connector.
    3. Measure the resistance of each (F342) ASD Control Output circuits from the C3 PDC harness connector to the appropriate terminals of PCM harness connector.

      Is the resistance below 5.0 Ohms?

      Yes 

      • Go To  3

      No 

      • Repair the open in the (F342) ASD Control Output circuit(s).
      • Perform the POWERTRAIN VERIFICATION TEST. Refer to POWERTRAIN VERIFICATION TEST .
  5. POWER DISTRIBUTION CENTER 
    1. Using the wiring diagram/schematic as a guide, inspect the wiring and connectors between the related PDC and the Powertrain Control Module (PCM).
    2. Look for any chafed, pierced, pinched or partially broken wires.
    3. Look for broken, bent, pushed out or corroded terminals. Verify that there is good pin to terminal contact in the PDC and Powertrain Control Module connectors.
    4. Perform any Technical Service Bulletins that may apply.

      Were there any problems found?

      Yes 

      No 

      • Replace and program the Power Distribution Center in accordance with the Service Information.
      • Perform the BODY VERIFICATION TEST. Refer to STANDARD PROCEDURE .