LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2014 >> Wrangler Sahara, Standard Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 8 (3.6L Engine (Service Information)) >> Cylinder Head >> Cover(S), Cylinder Head >> Installation >> Left

Cover(S), Cylinder Head: Installation: Left

WARNING: This page is about a different car, the 2014 Dodge Journey. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Magnetic Timing Wheels
GC0144158Courtesy of CHRYSLER GROUP, LLC
CAUTION:

The magnetic timing wheels (1) must not come in contact with magnets (pickup tools, trays, etc.) or any other strong magnetic field. This will destroy the timing wheels ability to correctly relay camshaft position to the camshaft position sensor.

Fig 2: Cylinder Head Cover Gasket & Spark Plug Tube Seals
GC0144274Courtesy of CHRYSLER GROUP, LLC
  1. Install the cylinder head cover gasket (1).
  2. The spark plug tube seals (2) can be reused if not damaged.
    Fig 3: Spark Plug Tube Seal & Installer
    GC0144499Courtesy of CHRYSLER GROUP, LLC
  3. If required, install new spark plug tube seals (2) in the cylinder head cover:
    • Lubricate the spark plug tube seal inner and outer diameters with clean engine oil.
    • Place the spark plug tube seal (2) on the Cam Sensor/Spark Plug Tube Seal Installer (special tool #10256, Installer, Cam Installer, Cam Sensor/Spark Plug Tube Seal) (1).
    • Push the seal into the cylinder head cover until the base of the seal is seated.
    • Remove the tool.
    Fig 4: RTV Sealant Locations
    GC0144275Courtesy of CHRYSLER GROUP, LLC
  4. Clean the timing engine timing cover, cylinder head and cylinder head cover mating surfaces with isopropyl alcohol in preparation for sealant application.
    CAUTION:

    Engine assembly requires the use of a unique sealant that is compatible with engine oil. Using a sealant other than Mopar® Threebond Engine RTV Sealant may result in engine fluid leakage.

    CAUTION:

    Following the application of Mopar® Threebond Engine RTV Sealant to the gasket surfaces, the components must be assembled within 20 minutes and the attaching fasteners must be tightened to specification within 45 minutes. Prolonged exposure to the air prior to assembly may result in engine fluid leakage.

  5. Apply a 2 to 3 mm wide bead of Mopar® Threebond Engine RTV Sealant (1) to the two engine timing cover to cylinder head T-joints as shown in illustration.
    Fig 5: Cylinder Head Cover Bolts & Double Ended Studs Tightening Sequence - Left
    GC0144195Courtesy of CHRYSLER GROUP, LLC
  6. Align the locator pins (1) to the cylinder head and install the cylinder head cover.
  7. Tighten the cylinder head cover bolts and double ended studs in the sequence shown in illustration to 12 N.m (106 in. lbs.).
    Fig 6: Electrical Connector, Ignition Coils & Ignition Coil Retaining Bolts
    GC0144206Courtesy of CHRYSLER GROUP, LLC
  8. If removed, install the spark plugs. Refer to SPARK PLUG, INSTALLATION .
  9. Install the ignition coils. Refer to COIL, IGNITION, INSTALLATION .
    Fig 7: Injection/Ignition Harness Retainers
    GC0144460Courtesy of CHRYSLER GROUP, LLC
  10. Engage two injection/ignition harness retainers (1) to the left cylinder head cover.
    Fig 8: CMP Sensor & Bolt
    GC0144205Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    The RH CMP sensor is shown in illustration, the LH CMP sensor is similar. If both RH and LH CMP sensors where removed, install them into their original locations.

  11. Install the camshaft position sensor. Refer to SENSOR, CAMSHAFT POSITION, INSTALLATION .
    Fig 9: Engine Coolant Temperature (ECT) Sensor Connector, Camshaft Position (CMP) Sensor & Harness Retainers
    GC0147022Courtesy of CHRYSLER GROUP, LLC
  12. Connect the electrical connector (5) to the left Camshaft Position (CMP) sensor.
  13. Engage one main wire harness retainer (2) to the cylinder head cover and one main wire harness retainer (4) to the cylinder head cover mounting stud.
    Fig 10: Variable Valve Timing Solenoids, Connectors & Bolts
    GC0144208Courtesy of CHRYSLER GROUP, LLC
  14. Refer to the markings made at disassembly and install the variable valve timing solenoids (2 and 4) in their original locations. Refer to SOLENOID, VARIABLE VALVE TIMING , INSTALLATION .
    Fig 11: Wire Harness Retainers & Variable Valve Timing Solenoid Connectors
    GC0147021Courtesy of CHRYSLER GROUP, LLC
  15. Engage three wire harness retainers (1) to the left cylinder head cover.
  16. Connect the electrical connectors (2) to the left variable valve timing solenoids.
    Fig 12: Intake Ports, Insulator & Alignment Posts
    GC0144184Courtesy of CHRYSLER GROUP, LLC
  17. Install the insulator (2) to the two alignment posts (3) on top of the LH cylinder head cover.
    Fig 13: Upper Intake Manifold Bolt Tightening Sequence
    GC0144185Courtesy of CHRYSLER GROUP, LLC
  18. Install the upper intake manifold (1), support brackets, resonator and air cleaner body. Refer to MANIFOLD, INTAKE, INSTALLATION .
  19. Connect the negative battery cable and tighten nut to 5 N.m (45 in. lbs.).
NOTE:

The Cam/Crank Variation Relearn procedure must be performed using the scan tool anytime there has been a repair/replacement made to a powertrain system, for example: flywheel, valvetrain, camshaft and/or crankshaft sensors or components.