Solenoid, Variable Valve Timing [ERB, ERC, ERD]: Removal: Left
WARNING: This page is about a different car, the 2016 Jeep Wrangler and 2015 Jeep Wrangler. However, it is still accessible from the selected car via links, so may be relevant.
- Disconnect and isolate the negative battery cable.
- Remove the engine cover. Refer to COVER, ENGINE, REMOVAL .
- Remove the throttle body (1). Refer to THROTTLE BODY, REMOVAL .
- Remove two nuts (2), two bolts (3) and reposition the left front upper intake manifold support bracket (1).
NOTE:
Mark the variable valve timing solenoid connectors (1) with a paint pen or equivalent so that they may be reinstalled in their original locations.
- Mark the intake variable valve timing solenoid (4) and the exhaust variable valve timing solenoid (2) with a paint pen or equivalent so that they may be reinstalled in their original locations.
- Disconnect the electrical connector (1) from the variable valve timing solenoid.
- Remove the variable valve timing solenoid mounting bolts (3).
- Pull the variable valve timing solenoid from the cylinder head cover.
- The seal (1) can be reused if not damaged.