LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2014 >> Wrangler Sahara, Standard Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 19 (Antilock Brake System (Abs) (Service Information)) >> Hydraulic/Mechanical >> Integrated Control Unit (ICU) >> Installation >> Right-Hand-Drive

Integrated Control Unit (ICU): Installation: Right-Hand-Drive

WARNING: This page is about a different car, the 2014 Dodge Journey. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Identifying ICU Mounting Components
GC0098437Courtesy of CHRYSLER GROUP, LLC
  1. Install the ICU with bracket (1) through the opening between the A/C lines and the exhaust manifold using the opposite of how it was removed.
  2. Install the ICU with bracket (1) into the engine compartment. Place the mounting bracket for the ICU (1) over the mounting stud and screw (3) and hang the assembly in place. Tighten the mounting nut (2) and mounting screw (3) to 23 N.m (17 ft. lbs.).
    Fig 2: Anti-Lock Brake Module Wiring Harness Connector
    GC0081322Courtesy of CHRYSLER GROUP, LLC
    1 - ABM (PART OF ICU)
    2 - WIRING HARNESS CONNECTOR
    CAUTION:

    Before installing the ABM harness connector on the ABM, be sure the seal is properly installed in the connector.

  3. Insert the ABM wiring harness connector (2) into the socket of the ABM (1) and close the cover, locking the connector in place.
    Fig 3: Identifying Brake Tubes At Hydraulic Control Unit
    GC0079880Courtesy of CHRYSLER GROUP, LLC
    CAUTION:

    The brake tubes must be routed to the correct ports. Improper routing can lead to degraded or undesirable system performance including external brake fluid leaks.

    • (1) Master Cylinder Secondary
    • (2) Front Left
    • (3) Front Right
    • (4) Master Cylinder Primary
    • (5) Rear Left
    • (6) Rear Right
    Fig 4: Identifying Brake Tubes At Hydraulic Control Unit
    GC0079880Courtesy of CHRYSLER GROUP, LLC
  4. Install the four chassis brake tubes (2, 3, 5, 6) at the ICU hydraulic control unit (7). Tighten the tube nuts to 17 N.m (150 in. lbs.).
  5. Install the primary (4) and secondary (1) brake tubes at the ICU hydraulic control unit (7). Tighten the tube nuts to 17 N.m (150 in. lbs.).
    Fig 5: Brake Pedal Holding Tool
    GC0098418Courtesy of CHRYSLER GROUP, LLC
  6. Remove the brake pedal holding tool.
  7. Install the engine appearance cover.
  8. Connect the battery negative cable to the battery post. It is important that this be performed properly. Refer to STANDARD PROCEDURE .
    Fig 6: Bleeding Brakes
    GC0079789Courtesy of CHRYSLER GROUP, LLC
  9. Hook up the scan tool to initialize the ABM and perform the following:
    1. Clear any faults.
    2. Fill the master cylinder to the proper fill level and bleed the base and ABS hydraulic systems. Refer to STANDARD PROCEDURE  or STANDARD PROCEDURE .
    3. Check for leaks.
    4. Perform the ABS Verification Test and road test the vehicle. Refer to STANDARD PROCEDURE .