LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2014 >> Grand Cherokee Laredo, RWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 3 (3.0L Turbo Diesel (Service Information)) >> Cylinder Head >> Cover(S), Cylinder Head >> Removal >> Right Bank

Right Bank

WARNING: This page is about a different variant/trim than selected.
  1. Disconnect the negative battery cable.
  2. Raise and support the vehicle. Refer to HOISTING, STANDARD PROCEDURE .
  3. Remove the front skid plate. Refer to PLATE, SKID, FRONT, REMOVAL .
  4. Remove the front suspension skid plate. Refer to PLATE, SKID, FRONT SUSPENSION, REMOVAL .
  5. Remove the lower engine oil dipstick bolt.
  6. Drain the cooling system. Refer to STANDARD PROCEDURE .
  7. Lower the vehicle.
    Fig 1: Engine Cover
    GC0146436Courtesy of CHRYSLER GROUP, LLC
  8. Remove the engine cover (1).
    Fig 2: Charge Air Hose, Clamps & Resonator
    GC0146726Courtesy of CHRYSLER GROUP, LLC
  9. Disconnect the Charge Air Cooler (CAC) hose at resonator (3)
  10. Remove the CAC hose (2) from the turbocharger.
  11. Release clips and remove the charge air resonator (3).
    Fig 3: Cowl Extension Silencer, Side Extensions & Fasteners
    GC0145586Courtesy of CHRYSLER GROUP, LLC
  12. Remove the cowl extension (1) and the side extensions (2, 5). Refer to SILENCER, COWL EXTENSION, REMOVAL .
    Fig 4: Coolant Bottle, Hoses & Fasteners
    GC0146725Courtesy of CHRYSLER GROUP, LLC
  13. Remove the coolant recovery bottle. Refer to BOTTLE, COOLANT RECOVERY, REMOVAL .
  14. Remove the generator. Refer to GENERATOR, REMOVAL .
    Fig 5: Two Nuts, Air Inlet Duct & Dash Panel
    GC0145675Courtesy of CHRYSLER GROUP, LLC
  15. Remove nuts and the HVAC air inlet housing (1).
    Fig 6: Oxygen Sensor Connector & Ball Stud Fastener
    GC0146434Courtesy of CHRYSLER GROUP, LLC
  16. Disconnect and remove the oxygen sensor wiring harness connector (1) from bracket.
  17. Remove the ball stud fastener (2) securing upper trans fill tube bracket.
  18. Remove nut and the engine oil dip stick.
    Fig 7: Right Exhaust Manifold Heat Shield & Bolts
    GC0146791Courtesy of CHRYSLER GROUP, LLC
  19. Remove bolts (1) and the right exhaust manifold heat shield (2).
    Fig 8: EGR Valve Wire Harness Connector
    GC0158070Courtesy of CHRYSLER GROUP, LLC
  20. Disconnect the EGR valve wire harness connector (1).
    Fig 9: EGR Cooler Vacuum Bypass Hose
    GC0146748Courtesy of CHRYSLER GROUP, LLC
  21. Disconnect the EGR cooler vacuum bypass hose (1).
    Fig 10: Turbocharger-To-EGR Cooler Tube Bolts
    GC0158212Courtesy of CHRYSLER GROUP, LLC
  22. Remove turbocharger-to-EGR cooler tube bolts (1).
  23. Remove the turbocharger-to-EGR cooler tube clamp (1).
    Fig 11: EGR Cooler Coolant Tube & Bolts
    GC0146645Courtesy of CHRYSLER GROUP, LLC
  24. Remove bolts (1 and 3) and the EGR cooler coolant tube (2).
    Fig 12: EGR Cooler Supply Hose
    GC0146747Courtesy of CHRYSLER GROUP, LLC
  25. Disconnect the EGR cooler supply hose (1).
    Fig 13: EGR Cooler Bypass Valve Support Bracket & Bolts
    GC0158004Courtesy of CHRYSLER GROUP, LLC
  26. Loosen bolt (1) securing EGR cooler bypass valve support bracket (2).
  27. Remove bolt (3) at the rear EGR cooler bypass valve support bracket (2).
    Fig 14: Cooler Assembly Bracket & Bolts
    GC0146749Courtesy of CHRYSLER GROUP, LLC
  28. Remove bolts (2) and the EGR and cooler assembly bracket (1).
    Fig 15: Oxygen Sensor Harness Connector Bracket & Fasteners
    GC0146753Courtesy of CHRYSLER GROUP, LLC
  29. Remove the engine cover ball stud bracket at front of right cylinder head cover.
  30. Remove bolt (1), nut (3) and the oxygen sensor harness connector bracket (2).
    Fig 16: Fuel Injector, Hold Down Bolt, Washer & Retaining Claw
    GC0146598Courtesy of CHRYSLER GROUP, LLC
  31. Remove the right side fuel injectors. Refer to INJECTOR(S), FUEL, REMOVAL .
    Fig 17: Turbocharger-To-EGR Supply Tube Heat Shield & Nuts
    GC0158000Courtesy of CHRYSLER GROUP, LLC
  32. Remove nuts (2) and the turbocharger-to-EGR supply tube heat shield (1).
    Fig 18: Cylinder Head Cover & Bolts
    GC0146717Courtesy of CHRYSLER GROUP, LLC
  33. Remove bolts (1) and the cylinder head cover (2).