LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2009 >> Commander 4WD V8-4.7L >> Repair and Diagnosis >> Transmission and Drivetrain >> Drive Axles, Bearings and Joints >> Axle Shaft Assembly >> Axle Shaft >> Service and Repair >> Front Axle - C200FE >> Installation

Installation






INSTALLATION

1. Lubricate bearing bore and seal lip with gear lubricant.
2. Install axle shaft and engage shaft into side gear. Push firmly on axle shaft to engage snap-ring.
3. Check the differential fluid level and add fluid if necessary.
4. Install half shaft.
5. Install skid plate, if necessary.