LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2008 >> Compass Limited, AWD, Automatic CVT >> Repair and Diagnosis >> External Pages >> Different car >> Section 35 (Ignition Control (Service Information)) >> SOLENOID, Variable Valve Timing >> Installation >> Rear Solenoid 1/2

Rear Solenoid 1/2

WARNING: This page is about a different car, the 2009 Jeep Patriot and 2009 Jeep Compass. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: SOLENOID MOUNTING TAB 1/2
GC0082441Courtesy of CHRYSLER LLC
  1. Rear variable valve timing solenoid. Note mounting tab location is different between front and rear solenoids.
  2. Install solenoid into cylinder head.
  3. Install mounting bolt and tighten to 12 N.m (9 ft. lbs.).
  4. Connect electrical connector to Variable valve timing solenoid.
    Fig 2: SOLENOID LOCATION 1/2
    GC0082440Courtesy of CHRYSLER LLC
  5. Connect negative battery cable.
  6. Install engine cover.