5.7L Engine
WARNING: This page is about a different car, the 2005 Jeep Grand Cherokee. However, it is still accessible from the selected car via links, so may be relevant.
- Position the A/C discharge line (1) into the engine compartment.
- Remove the tape or plugs from the opened discharge line fittings and the compressor and condenser ports.
- Lubricate new dual plane seals with clean refrigerant oil and install them onto the discharge line fittings. Use only the specified seals as they are made of a special material for the R-134a system. Use only refrigerant oil of the type recommended for the A/C compressor in the vehicle.
- Install the A/C discharge line onto the A/C compressor (4).
- Install the nut (2) that secures the A/C discharge line to the A/C compressor. Tighten the nut to 20 N.m (15 ft. lbs.).
- Install the A/C discharge line (5) into the retaining bracket (9) and to the A/C condenser (4).
- Install the nut (6) that secures the A/C discharge line to the A/C condenser. Tighten the nut to 20 N.m (15 ft. lbs.).
- If removed, install the A/C pressure transducer (7) onto the A/C discharge line. Tighten the A/C pressure transducer securely.
- Connect the wire harness connector (8) to the A/C pressure transducer.
- Install the air cleaner housing, air intake tube and the resonator (Refer to ENGINE/AIR INTAKE SYSTEM/HOUSING-AIR CLEANER - INSTALLATION) .
- Install the grille (Refer to BODY/EXTERIOR/GRILLE - INSTALLATION) .
- Reconnect the negative battery cable.
- Evacuate the refrigerant system. (Refer to REFRIGERANT SYSTEM EVACUATE ).
- Charge the refrigerant system. (Refer to REFRIGERANT SYSTEM CHARGE ).