Installation - Right Side
WARNING: This page is about a different car, the 2005 Jeep Grand Cherokee. However, it is still accessible from the selected car via links, so may be relevant.
| ITEM | DESCRIPTION | TORQUE |
| 1 | Cover Fasteners | 12 N.m (105 in. lbs.) |
CAUTION:
Do not use harsh cleaners to clean the cylinder head covers. Severe damage to covers may occur.
- Clean cylinder head cover and both sealing surfaces. Inspect and replace gasket as necessary.
- Install cylinder head cover and hand start all fasteners (1). Verify that all double ended studs are in the correct location shown in.
- Tighten cylinder head cover bolts and double ended studs to 12 N.m (105 in. lbs).
- Install right rear breather tube and filter assembly.
- Connect injector, ignition coil electrical connectors and harness retaining clips.
- Install the oil fill tube.
- Install PCV hose.
- Install heater hoses.
- Install air conditioning compressor retaining bolts.
- Install accessory drive belt (Refer to COOLING/ACCESSORY DRIVE/DRIVE BELTS - INSTALLATION) .
- Fill Cooling system (Refer to COOLING - STANDARD PROCEDURE) .
- Install air cleaner assembly, resonator assembly and air inlet hose.
- Connect battery negative cable.