Diagnostic Procedure
WARNING: This page is about a different car, the 2005 Jeep Liberty. However, it is still accessible from the selected car via links, so may be relevant.
P0581-SPEED CONTROL SWITCH NO. 1 HIGH DIAGNOSTIC TEST REFERENCE
| TEST | ACTION | APPLICABILITY |
|---|---|---|
| 1 |
NOTE:
Do not press any of the Speed Control Switch buttons. Ignition on, engine not running.With the DRBIII®, read the Speed Control voltage.Is the Speed Control voltage above 4.8 volt?Yes --> Go To 2No --> Refer to the INTERMITTENT CONDITION SYMPTOM .Perform POWERTRAIN VERIFICATION TEST VER - 4 . |
All |
| 2 | Turn the ignition off. Remove the Speed Control Switches from the steering wheel. Measure the resistance across each Speed Control Switch. Monitor the ohmmeter while pressing each function button on each switch. Resume/Accel - 15,400 ohms Cancel - 909 +/- 9 ohms Decel (Coast) - 2940 +/- 30 ohms On/Off - 0 ohms Set - 6650 +/- 66 ohms Does the function on the Speed Control Switches have the correct resistance value? Yes --> Go To 3 No --> Replace the Speed Control Switch that had the incorrect resistance value. Perform POWERTRAIN VERIFICATION TEST VER - 4 . |
All |
| 3 | Disconnect the upper and lower 6-way clockspring harness connectors per Service Information. Measure the resistance of the (K900) Sensor ground circuit between the upper and lower 6-way clockspring harness connectors. Measure the resistance of the (V37) S/C Switch Signal circuit between the upper and lower 6-way clockspring harness connectors. Was the resistance above 5.0 ohms for either circuit? Yes --> Replace the clockspring. Perform POWERTRAIN VERIFICATION TEST VER - 4 . No --> Go To 4 |
All |
| 4 | Connect the Clockspring harness connectors per Service Information. Disconnect the Speed Control On/Off Switch 2-way harness connector only. Ignition on, engine not running. Measure the voltage on the (V37) S/C Switch Signal circuit in the On/Off Switch 2-way connector. Is the voltage above 5.2 volts? Yes --> Repair the short to voltage in the (V37) S/C Switch Signal circuit. Perform POWERTRAIN VERIFICATION TEST VER - 4 . No --> Go To 5 |
All |
| 5 | Turn the ignition off. Disconnect the upper and lower Clockspring harness connectors per Service Information. Disconnect the C3 PCM harness connector.
CAUTION:
DO NOT PROBE THE PCM HARNESS CONNECTORS. PROBING THE PCM HARNESS CONNECTORS WILL DAMAGE THE PCM TERMINALS RESULTING IN POOR TERMINAL TO PIN CONNECTION. INSTALL MILLER SPECIAL TOOL #8815 TO PERFORM DIAGNOSIS. Measure the resistance of the (V37) S/C Switch Signal circuit from the lower Clockspring harness connector to the appropriate terminal of special tool #8815. Is the resistance below 5.0 ohms? Yes --> Go To 6 No --> Repair the open in the (V37) S/C Switch Signal circuit between the PCM and Clockspring. Perform POWERTRAIN VERIFICATION TEST VER - 4 . |
All |
| 6 |
CAUTION:
DO NOT PROBE THE PCM HARNESS CONNECTORS. PROBING THE PCM HARNESS CONNECTORS WILL DAMAGE THE PCM TERMINALS RESULTING IN POOR TERMINAL TO PIN CONNECTION. INSTALL MILLER SPECIAL TOOL #8815 TO PERFORM DIAGNOSIS. Measure the resistance of the (K900) Sensor ground circuit from the lower Clockspring harness connector to the appropriate terminal of special tool #8815.Is the resistance below 5.0 ohms?Yes --> Go To 7No --> Repair the open (K900) Sensor ground circuit between the PCM and Clockspring.Perform POWERTRAIN VERIFICATION TEST VER - 4 . |
All |
| 7 | Measure the resistance of the (V37) S/C Switch Signal circuit from the upper Clockspring harness connector to the On/Off switch harness connector. Is the resistance below 5.0 ohms? Yes --> Go To 8 No --> Repair the open in the (V37) S/C Switch Signal circuit, Clockspring to S/C Switch. Perform POWERTRAIN VERIFICATION TEST VER - 4 . |
All |
| 8 | Measure the resistance of the (K900) Sensor ground circuit from the On/Off Switch 2-way harness connector to the upper Clockspring harness connector. Is the resistance below 5.0 ohms? Yes --> Go To 9 No --> Repair the open in the (K900) Sensor ground circuit between the Clockspring and S/C Switch. Perform POWERTRAIN VERIFICATION TEST VER - 4 . |
All |
| 9 |
NOTE:
Before continuing, check the PCM harness connector terminals for corrosion, damage, or terminal push out. Repair as necessary. Using the schematics as a guide, inspect the wire harness and connectors. Pay particular attention to all Power and Ground circuits.If the there are no possible causes remaining, view repair.RepairReplace and program the Powertrain Control Module per Service Information.Perform POWERTRAIN VERIFICATION TEST VER - 4 . |