LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2005 >> Wrangler Rubicon, Automatic >> Repair and Diagnosis >> External Pages >> Different car >> Section 495 (Engine Cooling System & Automatic Transmission Cooling System) >> Transmission >> Transmission >> Standard Procedure - Transmission Cooler Line Quick Connect Fitting Disassembly/Assembly >> Connect

Standard Procedure - Transmission Cooler Line Quick Connect Fitting Disassembly/Assembly: Connect

WARNING: This page is about a different car, the 2005 Jeep Liberty. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Oil Cooler Line Quick Connect Fitting - Assembly
GC0001744Courtesy of DAIMLERCHRYSLER CORP.
1 - QUICK CONNECT FITTING
2 - CLIP
3 - OIL COOLER LINE
4 - DUST CAP
  1. Align transmission cooler line with quick connect fitting while pushing straight into the fitting.
  2. Push in on transmission cooler line until a "click" is heard or felt. See Fig 1.
  3. Slide dust cap down the transmission cooler line and snap it over the quick connect fitting until it is fully seated and rotates freely. See Fig 1. Dust cap will only snap over quick connect fitting when the transmission cooler line is properly installed.
NOTE: If dust cap will not snap into place, repeat assembly step #2.