LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 1997 >> Cherokee Country, RWD >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Removal & Installation - Aw4 & 30RH & 32RH & 42RE & 44RE Automatic Transmission >> Removal & Installation >> 30RH, 32RH, 42RE, 44RE & 46RE >> Installation

30RH, 32RH, 42RE, 44RE & 46RE: Installation

  1. To install, reverse removal procedure. Ensure torque converter is fully seated in transmission by measuring distance from cylinder block surface on torque converter housing to front edge of bolt lug on front of torque converter. Distance should be .500" (12.7 mm) when torque converter is fully seated.
    CAUTION: Proper length torque converter bolts must be used. If replacing torque converter bolts, ensure proper length bolt is used.
  2. Tighten bolt/nuts to specification. See TORQUE SPECIFICATIONS . Ensure reference marks on torque converter, flexplate, drive shaft flanges and yokes are aligned. Adjust shift cable or linkage, throttle valve cable and transfer case shift linkage if necessary. See the TRANSMISSION SERVICING - A/T article.
  3. Use NEW "O" ring when installing dipstick tube. Before installing oil cooler lines on transmission, ensure all fittings are clean. Install oil cooler line into quick disconnect fitting. Push oil cooler line inward until a click is heard. Pull on oil cooler line to ensure oil cooler line is locked in place. Fill transmission with MOPAR ATF Plus 3, Type 7176 fluid.