LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 1996 >> Grand Cherokee Limited, 5.2 Y >> Repair and Diagnosis >> External Pages >> Different car >> Section 28 (Steering Column Switches) >> Testing >> Combination Switch

Combination Switch

WARNING: This page is about a different car, the 1994 Plymouth Sundance, 1994 Plymouth Acclaim, 1994 Dodge Spirit, 1994 Dodge Shadow, and 1994 Chrysler LeBaron. However, it is still accessible from the selected car via links, so may be relevant.

Disconnect negative battery cable. Remove tilt lever, if equipped. Remove upper and lower column covers. Disconnect combination switch connector. Check for continuity between specified terminals. See COMBINATION SWITCH TURN SIGNAL TESTING  and COMBINATION SWITCH LOW/HIGH BEAM TESTING  . See Fig 1 . Replace combination switch if continuity is not as specified.

COMBINATION SWITCH TURN SIGNAL TESTING

Turn Signal Hazard Warning Continuity Between
Neutral Off 12, 14 & 15
Left Off 12 & 14; 15, 16 & 17; (1) 22 & 23
Right Off 11, 12 & 17; 14 & 15; (1) 23 & 24
Neutral On 11, 12, 13, 15 & 16
(1) With optional cornering lights.
COMBINATION SWITCH LOW/HIGH BEAM TESTING

Switch Position Continuity Between
Low Beam 18 & 19
High Beam 19 & 20
High Beam Passing 20 & 21
Fig 1: Identifying Combination Switch Terminals
G91I07816Courtesy of CHRYSLER CORP.