LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 1996 >> Grand Cherokee Limited, 5.2 Y >> Repair and Diagnosis >> External Pages >> Different car >> Section 188 (4.0L 6-CYL - VIN [S]) >> Removal & Installation >> Intake Manifold >> Installation

Intake Manifold: Installation

WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 1995 Jeep Wrangler, 1995 Jeep Grand Cherokee, 1995 Jeep Cherokee, 1994 Jeep Wrangler, and 1994 Jeep Grand Cherokee. However, it is still accessible from the selected car via links, so may be relevant.
  1. Ensure all gasket surfaces are clean. Install NEW gasket. Install exhaust manifold and tighten bolt No. 3 finger tight. Install intake manifold and remaining bolts loosely. Replace fuel line quick-connect "O" rings, spacers and retainers.
  2. Tighten bolts in proper sequence to specification. See Fig 1. See TORQUE SPECIFICATIONS. Reverse removal procedure to complete installation.
Fig 1: Manifold Tightening Sequence
G91E14302Courtesy of CHRYSLER CORP.