Reassembly & Installation
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 1995 Jeep Wrangler, 1995 Jeep Grand Cherokee, 1995 Jeep Cherokee, 1994 Jeep Wrangler, and 1994 Jeep Grand Cherokee. However, it is still accessible from the selected car via links, so may be relevant.
- Apply sealant to pick-up pipe and pump cover area prior to installation. To install pick-up pipe use Pipe Installer (7624). Ensure pick-up pipe support bracket aligns with pump cover bolt. If relief valve is replaced, ensure replacement valve is the same diameter as that removed.
- Fill pump cavity with petroleum jelly. Install cover. Tighten cover bolts to specification. Check pump gears for freedom of rotation. Install NEW gasket and oil pump. Tighten retaining bolts to specification. See TORQUE SPECIFICATIONS .