Test NS-7D - Inspecting Idle Air Control Motor Operation
WARNING: This page is about a different car, the 1995 Jeep Grand Cherokee. However, it is still accessible from the selected car via links, so may be relevant.
NOTE:
For circuit and connector terminal identification, see CONNECTOR IDENTIFICATION
in this article. For wiring diagram, see WIRING DIAGRAMS
section at the end of this article.
- Turn ignition off. Disconnect Powertrain Control Module (PCM) connector. Inspect connectors for damaged, pushed-out or miswired terminals. Repair as required. Perform TEST VER-1 . If PCM terminals are okay, go to next step.
- Using an external ohmmeter, check resistance of driver No. 4 circuit (Gray/Red wire) between IAC motor connector and PCM connector terminal No. 59. If resistance is less than 5 ohms, replace PCM. Perform TEST VER-1 . If resistance is more than 5 ohms, repair open Violet/Black or Gray/Red wire. Perform TEST VER-1 .