Removal & Installation: Transmission: Inspection
WARNING: This page is about a different car, the 1990 Dodge Ram Wagon, 1990 Dodge Ram Van, 1990 Dodge Pickup, 1990 Dodge Dakota, and 1990 Dodge Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
- Before installing converter, rotate front pump rotors with Aligner (C-3881) until 2 small holes in tool handle are vertical. Slide torque converter over input and reaction shafts, making sure converter hub slots are vertical, and fully engage pump inner rotor lugs.
- Test for full engagement by placing a straightedge across face of transmission case. Surface of converter front cover lug should be at least 1/2" to rear of straightedge when converter is fully engaged. Attach small "C" clamp to edge of converter housing to hold converter in place while installing transmission.
- Inspect converter drive plate for distortion or cracks and replace if necessary. Install drive plate and tighten bolts to specification.