Secondary Bulkhead Center Panel - INGENIUM I4 2.0L Diesel (G1893371): Installation
WARNING: This page is about a different car, the 2018 Jaguar E-Pace. However, it is still accessible from the selected car via links, so may be relevant.
-
- Install the secondary bulkhead center panel.
- Install the coolant pipe grommet.
- Install the 2 adhesive strips to the mating surface.
- Install and tighten the 5 bolts.
Torque : 10 Nm
-
CAUTION: To avoid damage carefully install the noise, vibration and harshness material.
- Install the Noise, Vibration and Harshness (NVH) material.
- Install and tighten the 7 nuts.
- Install and tighten the 2 lower NVH material nuts.
-
- Reposition the brake vacuum pipe into the correct position.
- Install the brake vacuum pipe grommet.
-
- Secure the wiring harness with the clip.
- Install the ground cable.
- Install and tighten the nut.
Torque : 8 Nm
-
- Reposition the wiring harness into the correct position.
- Secure the wiring harness with the clip.
- Install the wiring harness grommet.
- Connect the electrical connector.
-
NOTE: If equipped.
- Install the Diesel Exhaust Fluid (DEF) filler onto the bracket.
- Install and tighten the 2 bolts.
Torque : 8 Nm
- Secure the electrical connector with the clip.
-
- Secure the wiring harness with the clip.
- Install and tighten the electrical connector bolt.
Torque : 5 Nm
- Install the cowl panel.
Refer to: SPECIFICATIONS .
- Install the engine undershield.
Refer to: ENGINE UNDERSHIELD .
- Install the engine cover.
Refer to: ENGINE COVER - INGENIUM I4 2.0L DIESEL .
- Connect the startup battery ground cable.
Refer to: SPECIFICATIONS .