LEMON Manuals: Even more car manuals for everyone
Home >> Jaguar >> 2021 >> XF R-Dynamic SE >> Repair and Diagnosis >> External Pages >> Different car >> Section 93 (Engine - INGENIUM I4 2.0L Petrol -- XE (X760)) >> Engine - INGENIUM I4 2.0L Petrol >> Intake Camshaft >> Removal And Installation >> Installation

Removal And Installation: Installation

WARNING: This page is about a different car, the 2018 Jaguar XE. However, it is still accessible from the selected car via links, so may be relevant.
  1. Follow the tightening sequence
    Fig 1: Intake Camshaft Cap Bolts Tightening Sequence
    G11306869Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the inlet camshaft.
    • Install the camshaft bearing caps into the previously noted position. Lubricate the camshaft and the camshaft bearing caps with a small quantity of clean engine oil.
    • Tighten the 10 camshaft bearing cap bolts following the tightening sequence as illustrated.

      Torque Specification: 12 Nm 

  2. CAUTION: Install a new gasket.
    G11306865

    Install a new valve cover gasket.

    Renew Part: Camshaft cover gasket Quantity: 1. 

  3. G11445102
    • Install the valve cover.
    • Install the 3 guide pins as illustrated.

      Special Tool(s): JLR-303-1647 

  4. CAUTION: Tighten the retaining bolts in the sequence shown.
    G11445103

    Install the 16 retaining bolts.

    Torque Specification: 10 Nm 

  5. CAUTION: Tighten the retaining bolts in the sequence shown.
    G11306871
    • Remove the 3 guide pins, and install the 3 retaining bolts.

      Torque Specification: 10 Nm 

    • Tighten all retaining bolts to final torque.

      Torque Specification: 27 Nm 

  6. G11306863
    • Install the engine coolant bypass hose into the correct position.
    • Install the 2 retaining bolts.

      Torque Specification: 12 Nm 

  7. G11306862

    Install the 2 engine cover support mounts.

  8. G11306872
    • Connect the 8 engine wiring harness electrical connectors.
    • Install the 2 bolts.

      Torque Specification: 10 Nm 

  9. Install the accessory drive belt.

    Refer to: Accessory Drive Belt .

  10. Install the high pressure fuel pump, refer to High Pressure Fuel Pump
  11. Install the purge valve assembly.

    Refer to: Evaporative Emission Canister Purge Valve .

  12. Install the valve cover vent oil separator.
  13. Install the fuel injectors.

    Refer to: Fuel Injectors .

  14. Install the Continuous Variable Valve Lift (CVVL) assembly.

    Refer to: Continuous Variable Valve Lift .

  15. Install the upper timing chain.

    Refer to: Upper Timing Chain .

  16. Connect the startup battery ground cable.

    Refer to: Battery Disconnect and Connect .