LEMON Manuals: Even more car manuals for everyone
Home >> Jaguar >> 2021 >> F-Pace R-Dynamic S >> Repair and Diagnosis >> External Pages >> Different car >> Section 65 (Engine - INGENIUM I4 2.0L Petrol/INGENIUM I4 2.0L Petrol PHEV -- F-Pace/X761 (Specifications - Removal & Installation)) >> Engine - INGENIUM I4 2.0L Petrol/INGENIUM I4 2.0L Petrol - PHEV (G2412673) >> Removal And Installation >> Variable Camshaft Timing Unit (G2757515) >> Installation

Variable Camshaft Timing Unit (G2757515): Installation

WARNING: This page is about a different car, the 2023 Jaguar F-Pace and 2022 Jaguar F-Pace. However, it is still accessible from the selected car via links, so may be relevant.

The following step(s) applies to: 

All vehicles 

  1. CAUTION: Make sure that the upper timing chain does not come off the idler sprocket and stays in the correct position.
    G15617627Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the intake camshaft VCT  unit. Make sure that the correct VCT  unit is installed as noted in the removal steps.
    • Make sure that the camshaft pin is correctly seated in the VCT  unit as illustrated.
    • Install and tighten a new VCT  unit center bolt.

      Renew Part: Variable camshaft timing actuator bolts Quantity: 1 . 

      Torque 

      1. Stage 1: 10 Nm 
      2. Stage 2: Loosen 90° 
  2. CAUTION: Make sure that the upper timing chain does not come off the idler sprocket and stays in the correct position as illustrated.
    G15617628Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Inspect if the highlighted links on the timing chain is aligned with the timing mark on the idler sprocket and the VCT  unit as illustrated.

  3. CAUTION: Make sure that the upper timing chain does not come off the idler sprocket and stays in the correct position.
    G15617629Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install a new left upper timing chain guide.

      Renew Part: Upper timing chain guide Quantity: 1 . 

    • Install and tighten the bolt.

      Renew Part: Left side timing chain guide bolt Quantity: 1 . 

      Torque  : 25 Nm 

  4. CAUTION: Make sure that the upper timing chain does not come off the idler sprocket and stays in the correct position.
    G15617630Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Install a new upper timing chain tensioner arm.

    Renew Part: Timing chain tensioner arm Quantity: 1 . 

  5. CAUTION: Make sure that the upper timing chain does not come off the idler sprocket and stays in the correct position.
    G15617631Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the exhaust camshaft VCT  unit. Make sure that the correct VCT  unit is installed as noted in the removal steps.
    • Make sure that the camshaft pin is correctly seated in the VCT  unit as illustrated.
    • Install and tighten a new VCT  unit center bolt.

      Renew Part: Variable camshaft timing actuator bolts Quantity: 1 . 

      Torque 

      1. Stage 1: 10 Nm 
      2. Stage 2: Loosen 90° 
  6. CAUTION: Make sure that the upper timing chain does not come off the idler sprocket and stays in the correct position as illustrated.
    G15617632Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Inspect if the highlighted links on the timing chain are aligned with the timing mark on the idler sprocket and the 2 VCT  units as illustrated.

  7. CAUTION: Make sure that the upper timing chain does not come off the idler sprocket and stays in the correct position.
    G15617633Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install a new upper timing chain guide.

      Renew Part: Upper timing chain guide Quantity: 1 . 

    • Install and tighten the 2 bolts.

      Renew Part: Upper timing chain upper guide bolt Quantity: 2 . 

      Torque  : 11 Nm 

  8. G15617634Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the special tool JLR-303-1636.

      Special Tool(s): JLR-303-1636 

    • Install and tighten the 2 special tool bolts.

      Torque  : 13 Nm 

  9. G15617635Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Inspect if the new timing chain tensioner is in the reset position. The ratchet clip should be in the first groove as illustrated.

  10. G15617636Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Install and tighten the timing chain tensioner.

    Renew Part: Upper timing chain tensioner Quantity: 1 . 

    Torque  : 55 Nm 

  11. CAUTION:
    • Make sure that the timing chain tensioner piston is fully deployed.
    • Do not manually adjust the timing chain tensioner.
    G15617637Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    To properly install the timing chain tensioner, push the timing chain guide against the tensioner as illustrated. This allows the timing chain tensioner to reach its final tension position.

  12. G15617638Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Fully tighten the 2 VCT  center bolts.

    Torque 

    1. Stage 1: 25 Nm 
    2. Stage 2: 60° 
  13. G15617639Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Remove the 2 special tool bolts.
    • Remove the special tool JLR-303-1636.

      Special Tool(s): JLR-303-1636 

  14. G15617640Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Remove the 2 special tool bolts.
    • Remove the special tool JLR-303-1635.

      Special Tool(s): JLR-303-1635 

  15. G15617641Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Release the 2 special tool bolts.
    • Remove the special tool JLR-303-1630.

      Special Tool(s): JLR-303-1630 

    The following step(s) applies to: 

    Plug in hybrid electric vehicles only 

  16. G15617642Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Release the 2 special tool bolts.
    • Remove the special tools JLR-303-1630 and JLR-303-1686.

      Special Tool(s): JLR-303-1630  , JLR-303-1686 

    The following step(s) applies to: 

    All vehicles 

  17. NOTE: This step is to make sure that the timing components are properly installed.
    G15617643Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Use the special tool JLR-303-1656 crankshaft pulley locking tool to rotate the crankshaft 2 times clockwise.

    Special Tool(s): JLR-303-1656 

  18. G15617644Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Install a new drive chain cap.

    Renew Part: Timing chain plug Quantity: 1 . 

  19. G15617645Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the charge air cooler intake pipe.
    • Secure the charge air cooler intake pipe retaining clip.
  20. G15617646Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the hose.
    • Secure the hose clamp.
    • Connect the electrical connector.
  21. G15617647Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the hose.
    • Secure the hose clamp.
    • Secure the hose clip.
  22. G15617648Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Position the 2 hoses to their original position.
    • Secure the 2 hose connections.
    • Secure the hose clip.
  23. Install the upper timing cover.

    Refer to: UPPER TIMING COVER (G2498222) 

  24. Install the charge air cooler.

    Refer to: CHARGE AIR COOLER (G1998338)

  25. Connect the 12V system.

    Refer to: STARTUP BATTERY DISCONNECT AND CONNECT

    The following step(s) applies to: 

    Plug in hybrid electric vehicles only 

  26. G15617649Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Power up the HV  system. Only technicians qualified to EVAP  level are allowed to perform this procedure. It is mandated that all technicians involved with the steps in this procedure have read and understood the EV  Safety Rules.

    Refer to: PHEV POWER DOWN/UP - COMPLETE VEHICLE - PATHFINDER