Removal And Installation: Installation
WARNING: This page is about a different car, the 2018 Jaguar XE and 2017 Jaguar XE. However, it is still accessible from the selected car via links, so may be relevant.
- Clean all the mating faces and reusable parts thoroughly and check for damage.
- Install a new O-ring seal.NOTE: This step is only required if previously removed.
Renew Part: Halfshaft seal Quantity: 1.
Torque Specification: 115 Nm
- Refer to: Front Subframe - INGENIUM I4 2.0L Diesel .
- Refer to: Front Driveshaft - AWD .
- Refer to: Differential Draining and Filling .