General Procedures
WARNING: This page is about a different car, the 2018 Jaguar XE and 2017 Jaguar XE. However, it is still accessible from the selected car via links, so may be relevant.
NOTE:
- Some variation in the illustrations may occur, but the essential information is always correct.
- It is recommended that the DTI is capable of measurements of 0.005 mm.
- Raise the rear of the vehicle.WARNING: Make sure to support the vehicle with axle stands.
- Remove the rear brake disc.
For additional information, refer to: Brake Disc .
- Mount special tool 100-053 on the lower caliper support bracket as shown.
- A spacer washer may be required under the tool.
- Use the brake caliper support bolt and suitable nut.
- Position the Dial Test Indicator (DTI) gauge probe on the hub flange as shown.CAUTION: Take care not to contact the studs.
- Zero DTI and rotate the hub one complete revolution to measure hub runout. Hub runout must not exceed 0.025 mm.
- If the hub runout exceeds the limit, install a new hub and bearing.
For additional information, refer to: Rear Wheel Bearing .
- If the hub runout is within the limit install the removed components.