Upper Timing Cover: Removal
WARNING: This page is about a different variant/trim than selected.
NOTE:
Removal steps in this procedure may contain installation details.
- Disconnect the battery ground cable.
Refer to: STARTUP BATTERY DISCONNECT AND CONNECT
- Refer to: SECONDARY BULKHEAD RIGHT PANEL - INGENIUM I4 2.0L DIESEL
- NOTE: Install new gaskets.
Renew Part: Exhaust gas recirculation valve to crossover pipe gasket Quantity: 2 .
Torque: 12 Nm
Torque: 12 Nm
Torque: 12 Nm
Torque: 9 Nm
CAUTION:
Discard the gasket.