LEMON Manuals: Even more car manuals for everyone
Home >> Jaguar >> 2019 >> XF S >> Repair and Diagnosis >> External Pages >> Different car >> Section 235 (Rear Drive Axle/Differential -- XE/(760)) >> Rear Drive Axle/Differential (G1818451) >> Removal And Installation >> Rear Differential Oil Cooler - Project 8 (G2358258) >> Installation

Rear Differential Oil Cooler - Project 8 (G2358258): Installation

WARNING: This page is about a different car, the 2020 Jaguar XE and 2019 Jaguar XE. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the oil cooler assembly.
  2. Install the 4 oil cooler bracket retaining nuts.

    Torque  : 10Nm 

  3. Install the oil cooler to Electronic Torque Manager (ETM) unit union.

    Torque  : 30Nm 

  4. Install the oil cooler pipe support bracket bolt.

    Torque  : 29Nm 

  5. Raise the rear differential.

    General Equipment: Transmission jack 

  6. Install the rear differential bolts.

    Torque  : 192Nm 

  7. Install the front lower rear differential mounting brackets and bolts.

    Torque  : 110Nm 

  8. Remove the transmission jack.
  9. Install the lower oil cooler to rear differential pipe.

    Torque  : 6Nm 

  10. Connect the temperature sensor electrical connector.
  11. Secure the rear differential wiring harness.
    • Install the oil cooler pipe retaining bolt.

      Torque  : 10Nm 

    • Install the 2 oil cooler bracket retaining nuts.

    Torque  : 10Nm 

  12. Connect the oil cooler pump electrical connector and secure the wiring harness to the retaining clip.
  13. Install the rear differential oil cooler duct.

    Torque  : 10Nm 

  14. Align the rear driveshaft to the mark on the rear drive axle flange.
  15. Install the new 6 driveshaft to rear differential bolts.

    Renew Part: Driveshaft to rear differential bolts  Quantity: 1  .

    Torque  : 75Nm 

  16. Install both the rear halfshafts.

    Refer to: REAR HALFSHAFT - INGENIUM I4 2.0L DIESEL/INGENIUM I4 2.0L PETROL/V6 S/C 3.0L PETROL

  17. Install the rear bumper.

    Refer to: REAR BUMPER - PROJECT 8

  18. Install the exhaust system centre section.

    Refer to: EXHAUST SYSTEM CENTER SECTION

  19. Fill the rear differential.

    Refer to: DIFFERENTIAL DRAINING AND FILLING - PROJECT 8