Driveshaft - V8 S/C 5.0L Petrol, Project 8 (G2248156): Installation
WARNING: This page is about a different car, the 2020 Jaguar XE and 2019 Jaguar XE. However, it is still accessible from the selected car via links, so may be relevant.
-
-
WARNING: This requires the aid of another technician.
Install the rear driveshaft.
- Install the 2 bolts.
Torque : 47.5Nm
-
-
- Make sure that you re-align the driveshaft to the differential output flange using the alignment mark.
- Install the 6 new output flange bolts.
Renew Part: Driveshaft to front output flange bolts Quantity: 6.
Torque : 73Nm
-
- Make sure that you re-align the driveshaft to the transmission flange using the alignment mark.
- Install the 6 new driveshaft rear differential bolts.
Renew Part: Driveshaft to rear differential bolts Quantity: 6.
Torque : 73Nm
-
- Install the heatsheild.
- Install the 2 bolt and 2 clips.
Torque : 9Nm
- Install the exhaust system.
Refer to: EXHAUST SYSTEM CENTER SECTION
- Reset the Emergency Park Release (EPR) cable.