4.3 Pre-Delivery Inspection/Delivery To The Customer
WARNING: This page is about a different car, the 2019 Jaguar XE. However, it is still accessible from the selected car via links, so may be relevant.
Before the vehicle is handed over to the customer and as part of the Pre-Delivery Inspection (PDI), the condition of the battery needs to be confirmed. The battery condition must be checked in accordance with the battery test process utilizing a JLR approved tester. Refer to 'EQUIPMENT' (5) of this procedure.
NOTE:
The Midtronics code from the tester must be recorded on the form.
Any actions must be done in accordance with the 'Battery Tester Result Table' (6) of this procedure. The details must be recorded on the 'New Vehicle Storage Form' which is part of the 'New Vehicle Storage' document.
For additional information, Refer to: NEW VEHICLE STORAGE FORM