  1. CAUTION:
    • Use only a plastic scraper when removing the sealing material.
    • Use lint free cloth.
    • Make sure that the mating faces are clean and free of corrosion and foreign material.
    • Installation of the valve cover and tightening must be carried out within 7 minutes of applying the sealant.
    G11285320Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Apply 2 beads of silicone gasket sealant (Loctite 5901G or Loctite 5900) as shown on the illustration. The application of the sealant must be 1.5mm diameter 12mm long. Install the valve cover immediately after applying the sealant. The cover should be fitted directly to the head without smearing the sealant or the seals.

  2. G13879662Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Install new seals.

    Renew Part: Camshaft cover gasket Quantity: 1. 

    Renew Part: Camshaft cover gasket Quantity: 3. 

  3. NOTE: LH illustration shown, RH is similar.
    G11286954Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Using the special tool, install the valve cover.

    Special Tool(s)  : 303-1446 

  4. NOTE: Tighten the bolts in the indicated sequence.
    Fig 1: Right Side Valve Cover Bolts Tightening Sequence
    G11286963Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Install the bolts.

    Torque  : 13Nm 

  5. G11286956Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Remove the special tool.

  6. Install the breather.
    • Connect the electrical connectors.
    • Install the bolt.

      Torque  : 10Nm 

  7. Install the fuel rail.

    Refer to: RIGHT FUEL RAIL

  8. Install the supercharger.

    Refer to: SUPERCHARGER

  9. Connect the startup battery ground cable.

    Refer to: STARTUP BATTERY DISCONNECT AND CONNECT