LEMON Manuals: Even more car manuals for everyone
Home >> Jaguar >> 2018 >> E-Pace Base >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> Fuel Charging And Controls - Turbocharger - INGENIUM I4 2.0L Petrol -- E-Pace/X540 >> Fuel Charging And Controls - Turbocharger - INGENIUM I4 2.0L Petrol (G2110430) >> Removal And Installation >> Turbocharger HEATSHIELD (G2305890) >> Installation

Turbocharger HEATSHIELD (G2305890): Installation

  1. CAUTION: Bolts must be tightened in the sequence illustrated.
    Fig 1: Bolt Tightening Sequence
    G13897536Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the turbocharger lower heatshield.
    • Install and hand tighten bolts E and F.
    • Install the turbocharger upper heatshield.
    • Install and hand tighten bolts C and D.
    • Install the turbocharger to cylinder head bracket.
    • Install and hand tighten bolts A and B.
  2. CAUTION: Bolts must be tightened in the sequence illustrated.
    Fig 2: Bolt Tightening Sequence
    G13897536Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Tighten bolt A.

      Torque  : 10 Nm 

    • Tighten bolt B.

      Torque  : 10 Nm 

    • Tighten bolt A.

      Torque  : 22.5 Nm 

    • Tighten bolt B.

      Torque  : 22.5 Nm 

    • Tighten bolt C.

      Torque  : 9 Nm 

    • Tighten bolt D.

      Torque  : 9 Nm 

    • Tighten bolt E.

      Torque  : 9 Nm 

    • Tighten bolt F.

      Torque  : 9 Nm 

    • Install 2 new O-ring seals to the turbocharger oil return pipe.

      Renew Part: Turbocharger oil return pipe seals Quantity: 2  .

    • Install the turbocharger oil return pipe.
    • Install and tighten the bolt.

      Torque  : 11 Nm 

    • Install 2 new O-ring seals to the 2 turbocharger coolant pipes.

      Renew Part: Turbocharger coolant pipe O-ring seal Quantity: 2  .

    • Install the 2 coolant pipes.
    • Install and tighten the bolt.

      Torque  : 12 Nm 

  3. CAUTION: Bolts must be tightened in the sequence illustrated.
    NOTE: This step is only applicable if a new heatshield is installed.
    Fig 3: Bolt Tightening Sequence
    G13897538Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the catalytic converter heatshield.
    • Install and hand tighten bolts G, H, J and K.
    • Tighten bolt G.

      Torque  : 9 Nm 

    • Tighten bolt H.

      Torque  : 9 Nm 

    • Tighten bolt J.

      Torque  : 9 Nm 

    • Tighten nut K.

      Torque  : 9 Nm 

  4. CAUTION: Bolts must be tightened in the sequence illustrated.
    NOTE: This step is only applicable if the original heatshield is installed.
    Fig 4: Bolt Tightening Sequence
    G13897539Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC
    • Install the catalytic converter lower heatshield.
    • Install and hand tighten bolts G and K.
    • Tighten bolt G.

      Torque  : 9 Nm 

    • Tighten nut K.

      Torque  : 9 Nm 

    • Install the catalytic converter upper heatshield.
    • Install the clip.
    • Install and hand tighten bolts H, L and J.
    • Tighten bolt H.

      Torque  : 9 Nm 

    • Tighten bolt L.

      Torque  : 9 Nm 

    • Tighten bolt J.

      Torque  : 9 Nm 

    • Install the bracket.
    • Install and tighten the bolt.

      Torque  : 12 Nm 

    • Install the 3 wiring harness clips.
    • Install the 2 HO2S  to the 2 clips.
    • Connect the 2 electrical connectors.
  5. Install the electrical connector heatshield and the 2 fasteners.
    • Install the oil supply pipe.
    • Install the 2 new seals.

      Renew Part: Oil supply pipe sealing washers Quantity: 2  .

    • Install and tighten the new oil supply pipe bolt.

      Renew Part: Turbocharger oil supply pipe banjo bolt Quantity: 1  .

      Torque  : 18 Nm 

  6. Install the secondary bulkhead center panel.

    Refer to: SECONDARY BULKHEAD CENTER PANEL - INGENIUM I4 2.0L PETROL .

  7. Vacuum fill the cooling system.

    Refer to: COOLING SYSTEM PARTIAL DRAINING AND VACUUM FILLING - INGENIUM I4 2.0L DIESEL.

  8. Connect the 12 V system.

    Refer to: SPECIFICATIONS .