LEMON Manuals: Even more car manuals for everyone
Home >> Jaguar >> 2017 >> XJR L >> Repair and Diagnosis >> External Pages >> Different car >> Section 7 (Engine - V8 N/A 5.0L Petrol -- XJ/X351) >> Engine - V8 5.0L Petrol >> Removal And Installation >> Valve Cover RH (G1271907) >> Installation

Valve Cover RH (G1271907): Installation

WARNING: This page is about a different car, the 2013 Jaguar XJ, 2012 Jaguar XJ, 2011 Jaguar XJ, and 2010 Jaguar XJ. However, it is still accessible from the selected car via links, so may be relevant.
  1. CAUTION:
    • Use only a plastic scraper when removing the sealing material.
    • Use lint free cloth.
    • Make sure that the mating faces are clean and free of corrosion and foreign material.
    • Installation of the valve cover and tightening must be carried out within 7 minutes of applying the sealant.
    NOTE: Apply two beads of silcone gasket sealant (Loctite 5901G or Loctite 5900) as shown on the illustration. The application of the sealant must be 1.5mm diameter 12mm long. Install the valve cover immediately after applying the sealant. The cover should be fitted directly to the head without smearing the sealant or the seals.
    G11285320

    To install, reverse the removal procedure.

  2. G11285321

    Special Tool(s):  303-1446

  3. NOTE: Tighten the bolts in the indicated sequence.
    Fig 1: Right Valve Cover Bolts Tightening Sequence
    G11285329Courtesy of JAGUAR LAND ROVER NORTH AMERICA, LLC

    Torque Specifications: 13 Nm