Timing Cover: Installation
WARNING: This page is about a different car, the 2011 Jaguar XKR175, 2011 Jaguar XKR, and 2010 Jaguar XKR. However, it is still accessible from the selected car via links, so may be relevant.
- Apply RTV sealant WSE-M4G323-A6 (Loctite 5901G) to the areas shown, and tighten the bolts within 7 minutes.
- Apply RTV sealant WSE-M4G323-A6 (Loctite 5901G) to the areas shown, and tighten the bolts within 7 minutes.
- Torque: 12 Nm
- Torque: 12 Nm
- Apply RTV sealant WSE-M4G323-A6 (Loctite 5901G) to the areas shown, and tighten the bolts within 7 minutes.
- Install the bolts, but do not tighten fully at this stage.
Special Tool(s): 303-1433
- Torque:
M6 12 Nm
M8 20 Nm
- Remove the special tool.
- Torque: 12 Nm
- Torque: 12 Nm
- Torque: 12 Nm
- Refer to: Crankshaft Pulley .
- Refer to: Valve Cover RH .
- Refer to: Valve Cover LH .
- Refer to: THERMOSTAT HOUSING - V8 S/C 5.0L PETROL .
- Refer to: ACCESSORY DRIVE BELT TENSIONER (V8 S/C 5.0L PETROL) .
- Refer to: ACCESSORY DRIVE BELT IDLER PULLEY (V8 S/C 5.0L PETROL) .
- Refer to: BATTERY DISCONNECT AND CONNECT .
NOTE:
Tighten the bolts in the indicated sequence.
NOTE:
Tighten the bolts in the indicated sequence.
CAUTION:
Make sure that the mating faces are clean and free of foreign material.
NOTE:
Tighten the bolts in the indicated sequence.