Oil Pump: Installation
WARNING: This page is about a different car, the 2011 Jaguar XKR175, 2011 Jaguar XKR, and 2010 Jaguar XKR. However, it is still accessible from the selected car via links, so may be relevant.
- See figure.
- Torque:
M8 25 Nm
M6 12 Nm
- See figure.
- Torque: 12 Nm
- Torque: 21 Nm
- Install the lower timing chain making sure the coloured chain links align correctly with the fuel rail high-pressure fuel pumps camshaft and crankshaft sprocket markings.
- Torque: 21 Nm
- Install the lower timing chain making sure the coloured chain links align correctly with the fuel rail high-pressure fuel pumps camshaft and crankshaft sprocket markings.
- Torque: 21 Nm
- Refer to: Oil Pan Extension .
- Refer to: BATTERY DISCONNECT AND CONNECT .
NOTE:
Lubricate and install the new O-ring seals.
NOTE:
Lubricate and install the new O-ring seals.
NOTE:
Lubricate and install the new O-ring seals.
NOTE:
Tsubaki timing drive only.
CAUTION:
Make sure that the tensioner spring is correctly located.
NOTE:
Tsubaki timing drive only.
NOTE:
INA timing drive only.
CAUTION:
Make sure that the tensioner spring is correctly located.
NOTE:
INA timing drive only.