Pressure Cutoff Switch: Installation
WARNING: This page is about a different car, the 2011 Jaguar XKR, 2011 Jaguar XK, 2010 Jaguar XKR, and 2010 Jaguar XK. However, it is still accessible from the selected car via links, so may be relevant.
- Install the pressure cutoff switch.
- Clean the components.
- Install a new O-ring seal.
- Tighten the cutoff switch to 10 Nm (7 lb.ft).
- Connect the electrical connector.
- Install the air intake duct.
- Tighten the clips.
- Tighten the bolt to 10 Nm (7 lb.ft).
- Recharge the A/C system.
- Install the engine cover. Refer to Engine Cover information.
- Connect the battery ground cable and install the cover. Refer to Specifications information.
NOTE:
Lubricate the O-ring seals with clean refrigerant oil.