Convertible Top Striker: Installation
WARNING: This page is about a different car, the 2011 Jaguar XKR, 2011 Jaguar XK, 2010 Jaguar XKR, and 2010 Jaguar XK. However, it is still accessible from the selected car via links, so may be relevant.
- Install the convertible to latch striker.
- Install the Torx bolts, but do not tighten fully at this stage.
- Connect the electrical connector.
- Secure the wiring harness clip.
- Install the header rail.
- Tighten the screws.
- Secure the convertible to latch striker.
- Tighten the Torx bolts to 23 Nm (17 lb.ft).
- Install the header rail upper trim panel. See Header Rail Upper Trim Panel .
- Close the convertible top.