Convertible Top Assembly: Installation
WARNING: This page is about a different car, the 2011 Jaguar XKR, 2011 Jaguar XK, 2010 Jaguar XKR, and 2010 Jaguar XK. However, it is still accessible from the selected car via links, so may be relevant.
- Install the convertible top assembly.
- Tighten the nuts to 25 Nm.
- Connect the electrical connectors.
- Align the convertible top assembly. See Convertible Top Alignment .
- Close the convertible top to the position shown.
- Attach the convertible top compartment lid RH lift cylinder.
- Secure with the clips.
- Secure the convertible top fluid lines and harness.
- Secure the fluid line and harness clips.
- Connect the electrical connector.
- Install new cable ties.
- Open the convertible top to the position shown.
- Secure the convertible top hydraulic pump.
- Connect the convertible top hydraulic pump electrical connectors.
- Tighten the convertible top system pressure Allen bolt.
- Install the RH loadspace trim panel. Refer to Loadspace Trim Panel - Vehicles With: Convertible Top information.
- Install the rear quarter trim panels. Refer to Rear Quarter Trim Panel - Vehicles With: Convertible Top information.
NOTE:
Support the convertible top compartment lid.
NOTE:
The ignition must be switched off.