LEMON Manuals: Even more car manuals for everyone
Home >> Jaguar >> 2014 >> XK Base, 2D Coupe >> Repair and Diagnosis >> External Pages >> Different car >> Section 45 (Convertible Top) >> Convertible Top >> Removal And Installation >> Convertible Top Assembly >> Installation

Convertible Top Assembly: Installation

WARNING: This page is about a different car, the 2011 Jaguar XKR, 2011 Jaguar XK, 2010 Jaguar XKR, and 2010 Jaguar XK. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the convertible top assembly.
    • Tighten the nuts to 25 Nm.
    • Connect the electrical connectors.
  2. Align the convertible top assembly. See Convertible Top Alignment .
  3. Close the convertible top to the position shown.
    GJ0009610
  4. NOTE: Support the convertible top compartment lid.
  5. Attach the convertible top compartment lid RH lift cylinder.
    • Secure with the clips.
  6. Secure the convertible top fluid lines and harness.
    • Secure the fluid line and harness clips.
    • Connect the electrical connector.
    • Install new cable ties.
  7. Open the convertible top to the position shown.
  8. Secure the convertible top hydraulic pump.
    • Tighten the bolts to 8 Nm.
      GJ0010032
  9. Connect the convertible top hydraulic pump electrical connectors.
  10. NOTE: The ignition must be switched off.
  11. Tighten the convertible top system pressure Allen bolt.
    • Tighten to 2 Nm.
      GJ0010028
  12. Install the RH loadspace trim panel. Refer to Loadspace Trim Panel - Vehicles With: Convertible Top information.
  13. Install the rear quarter trim panels. Refer to Rear Quarter Trim Panel - Vehicles With: Convertible Top information.