LEMON Manuals: Even more car manuals for everyone
Home >> Jaguar >> 2012 >> XF Supercharged >> Repair and Diagnosis (Single Page) >> Drivelines & Axles >> Axle Shafts >> Rear Drive HALFSHAFTS -- XF/X250 >> Rear Drive HALFSHAFTS >> Removal And Installation >> Inner Constant Velocity (CV) Joint Boot (G1029571) >> Installation

Inner Constant Velocity (CV) Joint Boot (G1029571): Installation

  1. NOTE: Make sure that the protective sleeve is correctly installed, prior to installing the CV joint boot.
    G11420853
  2. NOTE: Install a new retaining clip.
    G11420854
  3. CAUTION:
    • Only use lubricants meeting the Jaguar specification.
    • Make sure the CV joint ball bearings do not drop out of the CV joint.
    NOTE: Clean the constant velocity (CV) joint, removing as much of the old grease as possible.
    G11420855

    Install the inner CV joint.

    Fill the CV joint with 40 grams of grease.

    Fill the CV joint boot with 100 grams of grease.

  4. CAUTION:
    • Make sure the CV joint is not separated from the halfshaft.
    • Make sure enough air is present in the CV boot.
    G11420856

    Install a new retaining clip.

  5. G11420857

    Install a new retaining clip.

  6. Remove the rear halfshaft from the clamp.
  7. Install the rear halfshaft.

    For additional information, refer to: Rear Halfshaft - GTDi 2.0L Petrol/V6 S/C 3.0L Petrol/V8 S/C 5.0L Petrol  (Removal and Installation).