Removal And Installation: Removal
WARNING: This page does not describe the selected car, but rather 12 other vehicles, including the 2015 Jaguar XKR-S, 2015 Jaguar XKR, 2015 Jaguar XK, 2014 Jaguar XKR-S, and 2014 Jaguar XKR. However, it is still accessible from the selected car via links, so may be relevant.
NOTE:
Removal steps in this procedure may contain installation details.
All vehicles
- Refer to: Battery Disconnect and Connect .
-
WARNING: Make sure to support the vehicle with axle stands.
Raise and support the vehicle.
- Refer to: Power Steering System Filling .
Torque Specification : 11 Nm
-
NOTE: Do not loosen the bolts more than 2 turns.
Torque Specification : 25 Nm
- Lower the vehicle.
Torque Specification : 10 Nm
Torque Specification : 10 Nm
Torque Specification : 25 Nm
-
WARNING: Fluid loss is unavoidable, use absorbent cloth or a container to collect the fluid.CAUTION: Always plug any open connections to prevent contamination.NOTE:
- Note the fitted position.
- Discard the sealing washers.
Torque Specification : 28 Nm
- Raise the vehicle.
Left-hand drive vehicles
-
CAUTION: Discard the bolt.NOTE: Note the fitted position.
Torque Specification : 35 Nm
Torque Specification : 100 Nm
All vehicles
Torque Specification : 63 Nm
-
CAUTION: Support the engine on a jack. The angle may need to be adjusted during this procedure.
Support the engine with the lifting equipment.
Torque Specification : 48 Nm
-
NOTE: Some variation in the illustrations may occur, but the essential information is always correct.
- Using a suitable wooden block, support the engine on the subframe.
- Lower the transmission jack.
Torque Specification : 25 Nm
Torque Specification : 25 Nm
-
NOTE:
- Note the fitted position.
- RHD shown, LHD is similar.