LEMON Manuals: Even more car manuals for everyone
Home >> Jaguar >> 2011 >> XK 2D Convertible >> Repair and Diagnosis >> External Pages >> Different car >> Section 118 (Pre-Delivery Inspection Manual -- XK/X150) >> Pre-Delivery Inspection Manual >> Introduction >> Description And Operation >> Preliminary Advice >> Battery Condition

Battery Condition

WARNING: This page does not describe the selected car, but rather 12 other vehicles, including the 2015 Jaguar XKR-S, 2015 Jaguar XKR, 2015 Jaguar XK, 2014 Jaguar XKR-S, and 2014 Jaguar XKR. However, it is still accessible from the selected car via links, so may be relevant.

Make sure the correct standard of battery care is applied to the battery, For additional information, refer to: Battery Care Requirements (Battery and Charging System - General Information, Description and Operation).

Whenever any work is carried out a Jaguar approved power supply must be connected to the vehicle.

For requirements for PDI/delivery to the customer, refer to: Battery Care Requirements (Battery and Charging System - General Information, Description and Operation).

Battery voltage must  be recorded during PDI and customer hand over. For additional information, refer to: New Vehicle Storage Form (Vehicle Transportation Aids and Vehicle Storage, Description and Operation).