Installation Procedure
WARNING: This page is about a different car, the 2007 Isuzu i-370, 2007 GMC Canyon, and 2007 Chevrolet Colorado. However, it is still accessible from the selected car via links, so may be relevant.
- Lubricate the valve stem and inner diameter of the new seal with clean engine oil.
- Using a twisting, pushing motion install the NEW valve stem seal using the J 38820 .
- Install the valve spring and valve spring retainer.
- Swing the arm over the valve spring retainer and tighten the swivel nut of the J-44228-A down only enough to allow access for installation of the valve locks.
- Position the valve locks to the valve stem retainer groove using the J 43059 .
- Remove the swivel nut and arm of the J-44228-A
- Install the arm and swivel nut of the J-44228-A over the stud of any other valves being serviced for this cylinder and repeat removal steps 11 through 16 and installation steps 1 through 7.
- Relieve the air pressure to the cylinder being serviced.
- Remove the J 39313 from the spark plug hole.
- Remove the base plate of the J-44228-A .
- Repeat removal steps 7 through 16 and installation steps 1 through 10 on any other cylinders being serviced.
- Install the spark plugs. Refer to Spark Plug Replacement .
- Install the valve rocker arms. Refer to Valve Rocker Arm and Valve Lash Adjuster Replacement .
- Raise and support the vehicle. Refer to Lifting and Jacking the Vehicle .
- Remove the EN 46547 (1) from the flywheel teeth.
- Install the service slot plug.
- Lower the vehicle.
IMPORTANT:
Install a seal protector over the valve stem prior to installing the valve stem seal.