LEMON Manuals: Even more car manuals for everyone
Home >> Isuzu >> 2007 >> i-290 LS, Automatic >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (Manual Transmission - AISIN Ar5) >> Repair Instructions >> Counter Gear Shaft Assemble >> Tools Required

Tools Required

WARNING: This page is about a different variant/trim than selected.

J 22912-B  Split-Plate Bearing Puller

    Fig 1: Installing A New Front Bearing On The Countershaft Using J 22912-01
    GM881173Courtesy of GENERAL MOTORS CORP.
  1. Using a hydraulic press and J 22912-B  under the gear, install a new front bearing on the countershaft.
    1. Install the bearing collar race on the countershaft.
    2. Install the bearing assembly with the retaining ring groove forward.
    3. Install the bearing inner race using a suitable press tube.
  2. Fig 2: Identifying Countershaft Front Bearing Retaining Ring
    GM881182Courtesy of GENERAL MOTORS CORP.
    IMPORTANT: The retaining ring is a select fit. Always install a new retaining ring.
  3. Select the maximum thickness retaining ring for the countershaft front bearing, that will fit in the groove. Refer to Countershaft Front Bearing Retaining Ring Specifications .
  4. Fig 3: Locating Countershaft Front Bearing Retaining Ring
    GM880853Courtesy of GENERAL MOTORS CORP.
  5. Install the countershaft front bearing retaining ring.