Installation Procedure
- Heat the mounting surface to approximately 27-41°C (80-105°F).
- Ensure that the temperature of the slats is approximately 29-32°C (85-90°F).
- Remove the backing from the adhesive on the slats.
- Align the luggage carrier slats with the masking tape.
- Install the luggage carrier slats to the vehicle.
- Apply equal pressure along the slats in order to uniformly bond the item to the mounting surface.
- Remove the masking tape from the vehicle.
IMPORTANT:
Apply the slats in an environment that is free from dust or other dirt that could come into contact with the sticky backing. Foreign material may cause improper adhesion.
IMPORTANT:
Do NOT touch the adhesive backing.