LEMON Manuals: Even more car manuals for everyone
Home >> Isuzu >> 2007 >> Ascender 4WD >> Repair and Diagnosis >> External Pages >> Different car >> Section 274 (Automatic Transmission - 4L60-E/4L65-E/4L70-E - Removal & Installation, Service, Overhaul, Troubleshooting & Diagnosis) >> Repair Instructions - Off Vehicle >> Converter Housing Installation >> Tools Required >> Installation Procedure

Installation Procedure

WARNING: This page is about a different car, the 2008 Isuzu Ascender, 2008 GMC Envoy, and 2008 Chevrolet TrailBlazer. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: View Of Oil Pump Seal, Converter Housing & Bolts
    GM1462837Courtesy of GENERAL MOTORS CORP.
    IMPORTANT:
    • Ensure the converter housing and case face are clean before installing a new pump seal.
    • When installing a new oil pump seal (5), the seal will protrude slightly above the case surface. The oil pump seal is a wedge design that will conform to the surfaces between the oil pump body and the transmission case as the converter housing (102) is installed.
  1. Install the oil pump seal (5). Seat oil pump seal (5) by hand, between pump body and case. Ensure the seal is evenly seated.
  2. Install the converter housing (102).
  3. NOTE: Refer to Fastener Notice .
  4. Using the J 41510  , install the converter housing bolts (94) to the transmission case. See Special Tools .

    Tighten: 

    • Tighten converter housing bolts evenly in a star pattern sequence.
    • Tighten the converter housing bolts (94) to 65-75 N.m (48-55 lb ft).