Installation (DOHC)
- Lubricate camshaft with engine oil. Install camshaft in cylinder head. Ensure locating dowel for camshaft sprocket is at the 12 o'clock position. Apply Sealant (TB-1207B) to contact surfaces between camshaft bearing caps and cylinder head for No. 1 and No. 5 bearing caps. See Fig 1
.
- Install camshaft bearing caps in original location. Tighten bolts in sequence to specification. See Figure
. See TORQUE SPECIFICATIONS
.
- Lubricate seal lip with engine oil. Using Seal Installer (J-37989), install new seal on camshafts.
- To install remaining components, reverse removal procedure. Ensure reference marks align when installing distributor, and timing marks align when installing timing belt.
CAUTION:
If cylinder head or camshaft are serviced or replaced, valve clearance must be checked. See VALVE CLEARANCE ADJUSTMENT
under ADJUSTMENTS.
- Before installing valve cover, apply Sealant (TB-1207B) at valve cover-to-camshaft bearing cap surfaces for No. 1 and No. 5 bearing caps. To install valve cover, reverse removal procedure.
- Tighten valve cover bolts to specification in proper sequence. See Figure
. See TORQUE SPECIFICATIONS
. Adjust all fluid levels.
Courtesy of ISUZU MOTOR CO.