Inspection After Removal
WARNING: This page is about a different variant/trim than selected.
Appearance
Check the following items, and replace the part if necessary.
- Transverse link for deformation, cracks or damage.
- Check the bushing for complete separation. (If completely separated, inner metal can be pulled out from transverse link.)
- Ball joint boot for cracks or other damage, and also for grease leakage.
Ball Joint Inspection
Manually move ball stud to confirm it moves smoothly with no binding.
Swing Torque Inspection
- Move the ball stud at least ten times by hand to check for smooth movement.
- Hook a spring balance (A) at cotter pin mounting hole. Confirm spring balance measurement value is within specifications when ball stud begins moving.
Swing torque
: Refer to Ball Joint .
- If swing torque exceeds standard range, replace transverse link assembly.
Rotating Torque Inspection
- Move the ball stud at least ten times by hand to check for smooth movement.
- Attach mounting nut to ball stud. Make sure that rotating torque is within specifications with a preload gauge (A) [SST: 3127S000 (J-25765-A)].
Rotating torque
: Refer to Ball Joint .
- If rotating torque exceeds standard range, replace transverse link assembly.
Axial End Play Inspection
- Move the ball stud at least ten times by hand to check for smooth movement.
- Move tip of ball stud in axial direction to check for looseness.
- If there is axial end play, replace transverse link assembly.