Diagnosis Procedure
- PERFORM INITIALIZATION PROCEDURE
- Initialization procedure is executed and operation is confirmed. Refer to Description .
- Check tilt up/down & slide open/close operations with sunroof switch.
Is the inspection result normal?
YES
INSPECTION END
NO
GO TO 2.
- CHECK SUNROOF SWITCH GROUND CIRCUIT
- Turn ignition switch OFF.
- Disconnect sunroof switch harness connector.
- Check continuity between sunroof switch harness connector and ground.
Sunroof switch
Ground
Continuity
Connector
Terminal
R16
1
Existed
Is the inspection result normal?
YES
GO TO 3.
NO
Repair or replace harness or connector.
- CHECK SUNROOF SWITCH INPUT SIGNAL
- Turn ignition switch ON.
- Check voltage between sunroof switch harness connector and ground.
(+)
(-)
Voltage (V)
(Approx.)
sunroof switch
Connector
Terminal
R16
3
Ground
Battery Voltage
4
Is the inspection result normal?
YES
GO TO 5.
NO
GO TO 4.
- CHECK SUNROOF SWITCH CIRCUIT
- Turn ignition switch OFF.
- Disconnect sunroof motor assembly harness connector.
- Check continuity between sunroof motor assembly harness connector and sunroof switch harness connector.
Sunroof motor assembly
Sunroof switch
Continuity
Connector
Terminal
Connector
Terminal
R4
5
R16
3
Existed
10
4
- Check continuity between sunroof motor assembly harness connector and ground.
Sunroof motor assembly
Ground
Continuity
Connector
Terminal
R4
5
Not existed
10
Is the inspection result normal?
YES
Replace sunroof motor assembly. Refer to Removal and Installation .
NO
Repair or replace harness or connector.
- CHECK SUNROOF SWITCH
Check sunroof switch.
Refer to Component Inspection .
Is the inspection result normal?
YES
Check intermittent incident. Refer to Intermittent Incident .
NO
Replace sunroof switch. Refer to Removal and Installation .